Scope of work: Remove approximately 2,100 linear feet of existing timber bulkhead and replace with a composite sheeting bulkhead, new drainage, curb, sidewalk, and asphalt roadway.
Numerous challenges including accessibility, utility interference with high voltage and communication cables submarined under the water. Replacing the existing bulkhead that is failing in such a way that the roadway and sidewalk doesn’t settle more than it has.