$10 million dredging project of Cooper River bottom to deepen the channel and remove sediment contaminants.
Removal of approximately 65,000 cubic yards of sediment from the Cooper River Lake, site clearing, soil erosion and sediment control, mobilization and site construction of a rapid dewatering facility, separation of sand and course material, dewatering of the sediment, trucking of the dewatered dredge material to a suitable disposal location, sediment testing as required by the disposal facility, as-built hydrographic survey, and site restoration.